HDD Subcontractor for Data Center Power Conduit Crossings

— Sloan Underground Construction

Free Estimate

Tell us about the job

Send the address, the utility and the rough distance. The site visit and written estimate are free.

No obligation. The site visit and written estimate are free.

Sloan Underground Construction bores power conduit crossings on data center sites as an HDD subcontractor: HDPE conduit, single or bundled, pulled under roads, paved yards and existing utilities so the feeder route is not interrupted by a trench. If your feeder route has a crossing your site contractor cannot open-cut, that crossing is the scope we take on.

Who bores power conduit crossings on a data center site?

Power conduit crossings are bored by a horizontal directional drilling (HDD) subcontractor working under the general contractor, the electrical contractor or the site utility contractor. The drilling crew places the conduit under the obstacle; the electrical contractor pulls and terminates the cable afterward.

Most of a feeder route is built in open trench. The exceptions are the places a trench cannot go: the main entrance road while construction traffic is using it, a paved equipment yard, a public road between two parcels, or a band of utilities already in service. Our overview of working as a directional boring subcontractor for data centers covers the other utilities we bore; this page is about power.

When is a power feeder crossing bored instead of trenched?

A feeder crossing is bored when cutting the surface costs more than drilling under it. That is usually a question of traffic, paving and what is already buried there, not of distance.

  • The road has to stay open. Deliveries and crews keep using it while the conduit goes in beneath.
  • The paving is finished. A bore leaves no trench patch in a truck route or an equipment yard.
  • Utilities are in the way. The bore passes under or beside in-service lines once they have been located and exposed.
  • The crossing is on a public road. The road owner may require a bored crossing under an encroachment permit; confirm with the road owner.

Our article on how a bore crosses a road explains the permit path for state and county roads.

How does a bored conduit bundle differ from a duct bank?

A bored bundle and a duct bank carry the same cables in different ways, and your engineer of record decides where each is allowed. The differences below are the ones to raise before the crossing is priced.

Trenched duct bankBored conduit bundle
How it is builtOpen trench, conduits set on spacersDrilled path, conduits pulled back together
Around the conduitsConcrete or backfill, per the designNative soil; no encasement
Conduit spacingHeld by the spacersConduits lie close together in the hole
SurfaceOpened for the full lengthOpened only at the two pits
Who signs offBuilt to the drawingsEngineer approves the bored section

Spacing is the point engineers look at first, because how close power cables sit to each other affects how they are rated. That is a design decision, not a drilling one. We build what the approved crossing detail shows. For how duct banks, sweeps and pull boxes fit together, see underground conduit systems, explained.

What conduit do we pull through a power crossing?

The conduit pulled through a bored power crossing is normally HDPE, because it is flexible and continuous and follows the curve of a bore path without joints under the road. Your specification sets the size, wall and count.

The rig has to match the bundle. Bore length, the combined diameter of the conduits and the soil decide which machine is needed. Sloan Underground runs Ditch Witch JT-5, JT-520 and JT-2020 directional drills, which suit conduit crossings under roads and paved yards. Send the conduit schedule and we will tell you plainly which crossings fit our rigs and which need a larger one. Rock changes the tooling and the schedule; see directional boring through rock.

What do you get back when the crossing is done?

You get conduit that is ready for the electrical contractor and a record of where it is. Each crossing is handed back with these four things done.

  1. Conduit in place from pit to pit, at the depth the crossing detail calls for.
  2. Pull tape left in each conduit.
  3. Ends capped and left accessible for the tie-in to the trenched run.
  4. A record of the path and depth for the owner and the next phase.

What do we need from you to price a power crossing?

To price a power crossing we need the route, the conduit schedule, the approved crossing detail and what is already in the ground. Send what you have.

  • The feeder route with each crossing marked and its rough length.
  • The conduit schedule: size, wall and count at each crossing.
  • The crossing detail your engineer has approved, including depth.
  • Existing utilities at each crossing, and any soil or rock information.

Beyond drilling, our crews place the conduit, pipe and boxes: see conduit placement and commercial underground utilities. Sloan Underground has worked in underground utilities since 1965 and holds SC General Contractor license #14665. Call (864) 386-1649 or use the form on this page to send the scope.

Frequently Asked Questions

Does Sloan Underground bore power conduit crossings as a subcontractor?

Yes. Sloan Underground Construction bores conduit under roads, paved yards and existing utilities as a subcontractor to general contractors, electrical contractors and site utility contractors. Send the conduit schedule and the crossings for a price.

Can several power conduits be pulled through one bore?

Yes. Conduits can be bundled and pulled back together through one bore. How many fit depends on the conduit sizes, the crossing length and the drill, so the bundle is planned before the rig is chosen.

Is a bored conduit bundle the same as a concrete-encased duct bank?

No. A duct bank is built in an open trench with spacers and concrete around the conduits. A bored bundle is pulled through a drilled hole with no encasement, and the conduits sit closer together. Whether a bored section is acceptable at a crossing is the decision of your engineer of record.

Who pulls the cable?

Cable pulling and terminations are normally in the scope of the electrical contractor. We place the conduit, leave pull tape in each one and hand over a record of the path and depth.

Need an HDD Subcontractor for Power Crossings?

Send the drawings and the conduit schedule. Sloan Underground bores conduit across Greenville, the Upstate, the Midlands and Western NC.